Seeing as all the engineering departments are now moving into TV systems to do their work we decided to have a massive tidy up. Not the most exciting of jobs but something that needed to be done none the less! We began by sorting through the piles of equipment and sorting it into different groups, transmission, audio, video etc. Then we created separate areas for all of these so that we would know where everything was when we needed to get to it.

Then we had the daunting task of sorting through and recoiling the cabling that was all over the floor, however with all of us helping out it didn't take that long before we had loads of need piles of video and audio cabling. 


After moving a few of the defunct racks about and re-positioning them at the back of TV Systems we then had a space in which we could place our newly created TX, OB and Interactive racks.


The last thing to do was to install a couple of internet connected PC's at the back of the room, a mega sound system and place a few tools here and there. As an afterthought we also obtained a white board and some engineeringesque posters to brighten the place up. TV Systems has now been affectionately been dubbed the "engineering office" and hopefully we'll be able to get a fair amount of Rave Live stuff done!

No comments:

Post a Comment