Meanwhile we racked the TX equipment (encoders, mux, IRD etc) into one of these racks in preparation. It got a bit fiddly in terms of leaving enough space so that everything could be cooled and so that each piece of equipment would be easily accessible from the back of the rack. In the end everything managed to fit and after plugging up and sorting out a few minor problems within the encoder configurations the rack was up and running again.
Tuesday, 6 April 2010
Transmission - Racking the Equipment
Meanwhile we racked the TX equipment (encoders, mux, IRD etc) into one of these racks in preparation. It got a bit fiddly in terms of leaving enough space so that everything could be cooled and so that each piece of equipment would be easily accessible from the back of the rack. In the end everything managed to fit and after plugging up and sorting out a few minor problems within the encoder configurations the rack was up and running again.