Transmission - Omneon

Even though we have been talking with Timeline about the possibility of getting an EVS from them to deal with playout I still felt that it would be use3ful to get the Omneon up and running as a backup. I connected the director to two media ports via firewire and then powered up the store. At this point I realised that I didn’t have the connector between the fibre channel connections on the Director and the 9 pin D-type connections on the store. After a fruitless search for this cable I emailed Omneon support using a link on their website.
 
 N-Store

Simon from Omneon support got back to me on the same day and has been incredibly useful helping to identify our system as a D1 (Director) with an NStore (Storage). However he also stated that “This is a very old unsupported system”, no surprises there, but it appeared that all we were missing was the connection cable which is hopefully being sent through as I write this.

 Director

Although we may not use the Omneon on the day we will certainly get the system up and running and ingest content onto it just to make sure that it still works. At the end of the day the EVS will have to be returned and while it is a viable work around I think we still need to be looking at re-integrating the Omneon with the Pharos control platform in the long term. Maybe this could be done next year as a side project integrating it with the mobile presentation racks.
 
Fibre Channel Connections

Tuesday, 4 May 2010

Transmission - Bug Burners


Over the past few weeks I have been involved in several smaller projects that I just haven't had the time to blog but I'll try and do all that in the next few days.

The first is the bug burners. After messing around with these a few weeks ago Jamie and I managed to get one Probel bug-burner keying and filling the old logo correctly while another one appeared to have troubles with it's SDI i/p and so we had to use it to generate the bug and then use a Microvideo bug-burner to key and fill (this was the only solution at the time because we couldn't figure out whether or not the Microvideos' had a way to store the image to be keyed).

I was still not happy with this situation so  couple of weeks ago I went back to the bug-burners and had another look. This started with a repeat of the original test which again proved that Channel 2's bug-burner wasn't working, so I disassembled the casing to take a look at the different cards inside. James Uren and I were able to isolate the fault down to the SDI i/p card, which was different on each bug-burner. After testing voltages over the card we began to further cut down the peripherals to a small pot on the card. Adjusting this proved to be the key as the background signal began to appear, I will openly admit however that we are still not sure what exactly this pot is for, we believe it to be some kind of i/p timing adjustment which would make sense.

After doing this I then began looking at how to get our new bugs being generated and keyed. I had previously been told that I would need to use the Mirada Animation tool on the Router PC to generate a different file-type (.oxt) but after several attempts at doing this and ending up with files that were far to large to fit on a floppy disk (1.44MB) I began looking for a user manual to see what I really needed.

As it happens the bug-burners will take TARGA (.tag) files, this can be either stored as a key or an image and must be named accordingly (imag.tga, key.tga). I got branding to create a white bug, correctly positioned on a 720 x 576pix black background which I then renamed as imag.tga and uploaded to the bug-burners. Thankfully it worked and the bug was keyed over the video, this can then be readjusted in terms of positioning and transparency but the basic idea was that it was working. The only problem now is that this bug has serious amounts of aliasing on it, which of course won't pass QC, that's another problem for another day though because at least the system is working!

Sunday, 11 April 2010

Transmission - Bug Burners

Last week Jamie (Head of TX) and I spent the morning trying to find ways in which to get the bug burners to work. Using the bug files from last year we each started work on an individual channel to see who could find the most efficient way of doing this. There was further complexity in the fact that the bug-burners had been wired in a very strange way last year as they were also used to insert GPI's for the WSS inserters. 

After trying many different attempts we finally figured out that one of the bug-burners didn't want to store the file on its internal storage, so we took a step back and used a spare burner to store and generate the key image which would then be passed into the original burner which would also fill the key. 

Luckily the other bug-burner was working fine and was able to both key and fill the image by itself. 

More information about the rest of the weeks tasks can be found on Jamies blog.


Pres 1 Standalone Bug/Keyer


 
  Pres 2 Bug Generator

Pres 2 Keyer


 Pres 2 Output

Tuesday, 6 April 2010

Transmission - Racking the Equipment

We have finally managed to find and sort out some half height mobile racks that we think will be suitable for the TX, Distribution and Presentation areas on the day of the event. Jamie has been busy drawing up system diagrams and working out what pieces of equipment would need to appear on the CTP's of each rack.

Meanwhile we racked the TX equipment (encoders, mux, IRD etc) into one of these racks in preparation. It got a bit fiddly in terms of leaving enough space so that everything could be cooled and so that each piece of equipment would be easily accessible from the back of the rack. In the end everything managed to fit and after plugging up and sorting out a few minor problems within the encoder configurations the rack was up and running again. 

 

Wednesday, 3 March 2010

Engineering - Update

There have been several developments over the past week. The first concerns the transmission equipment, this was all removed from Pres today and placed up in TV Systems for the time being. The idea is to store it here whilst the rest of the chain is being constructed, this allows easy access to the individual items of equipment. Although this seems like a good idea on the surface, it may prove to be a bad move because now there is no reference to build the new system from, whereas before if a certain item was proving to be difficult to implement it could be checked out in Pres, now it will all have to be completely assembled from scratch.

The interactive build is proceeding well and after speaking to Max last week there are several things that he needs to implement before the next stage:
The sign-up section on the Media Bugs website (where production crews will register for their "Rave Live ID Numbers") needs to have an opt out check box or drop down in it so that people have the option to sign up-to Rave Live but will not remain on the Media Bugs system after the event.
There are a lot of engineers waiting to do some coding so we need to know what needs to be done in php and MySQL so that we can get on with it.
To proceed with Brandings' "augmented reality" logo we need the Rave Live logo as a .dae (Digital Asset Exchange) file.

The OB builds are fairly stagnant at the moment because the programme producers are yet to see the space that they have to work with at the venue (the next site visit is scheduled for the 8th March). Once they have visited then we can begin to gather their equipment requirements and contact the various companies with regards to borrowing some kit off them. There was also bad news in that SiS could not provide us with an OB unit this year due to scheduling constraints. After explaining this to management the decision was taken to approach Telegenic, who kindly provided us with a second OB unit last year, to see if they would be interested again this year. We have also began to build up a contingency plan should we not be able to obtain a truck, this would be in the form of a flyaway although positioning and equipment specifications have yet to be decided.

The last major news is that Jacques and Richard have finally managed to discuss where the lines are going to be run, they are now drawing up cable schedules for the day which can be forwarded onto Matter for them to approve. Once this is done we can begin costing and budgeting for the coax runs around the venue. We have also sent an email to be forwarded onto AEG inquiring about whether or not positioning an antenna on the O2 would be possible and if opening up the various ports needed for Adobe RTSP and MySQL access would be possible, and if there would be a cost involved in doing either of these.