Sunday, 11 April 2010

Transmission - Bug Burners

Last week Jamie (Head of TX) and I spent the morning trying to find ways in which to get the bug burners to work. Using the bug files from last year we each started work on an individual channel to see who could find the most efficient way of doing this. There was further complexity in the fact that the bug-burners had been wired in a very strange way last year as they were also used to insert GPI's for the WSS inserters. 

After trying many different attempts we finally figured out that one of the bug-burners didn't want to store the file on its internal storage, so we took a step back and used a spare burner to store and generate the key image which would then be passed into the original burner which would also fill the key. 

Luckily the other bug-burner was working fine and was able to both key and fill the image by itself. 

More information about the rest of the weeks tasks can be found on Jamies blog.


Pres 1 Standalone Bug/Keyer


 
  Pres 2 Bug Generator

Pres 2 Keyer


 Pres 2 Output

Tuesday, 6 April 2010

Engineering - Update

Seeing as all the engineering departments are now moving into TV systems to do their work we decided to have a massive tidy up. Not the most exciting of jobs but something that needed to be done none the less! We began by sorting through the piles of equipment and sorting it into different groups, transmission, audio, video etc. Then we created separate areas for all of these so that we would know where everything was when we needed to get to it.

Then we had the daunting task of sorting through and recoiling the cabling that was all over the floor, however with all of us helping out it didn't take that long before we had loads of need piles of video and audio cabling. 


After moving a few of the defunct racks about and re-positioning them at the back of TV Systems we then had a space in which we could place our newly created TX, OB and Interactive racks.


The last thing to do was to install a couple of internet connected PC's at the back of the room, a mega sound system and place a few tools here and there. As an afterthought we also obtained a white board and some engineeringesque posters to brighten the place up. TV Systems has now been affectionately been dubbed the "engineering office" and hopefully we'll be able to get a fair amount of Rave Live stuff done!

Transmission - Racking the Equipment

We have finally managed to find and sort out some half height mobile racks that we think will be suitable for the TX, Distribution and Presentation areas on the day of the event. Jamie has been busy drawing up system diagrams and working out what pieces of equipment would need to appear on the CTP's of each rack.

Meanwhile we racked the TX equipment (encoders, mux, IRD etc) into one of these racks in preparation. It got a bit fiddly in terms of leaving enough space so that everything could be cooled and so that each piece of equipment would be easily accessible from the back of the rack. In the end everything managed to fit and after plugging up and sorting out a few minor problems within the encoder configurations the rack was up and running again. 

 

Saturday, 3 April 2010

Engineering - Musion

On Wednesday Emily (Sponsorship & Branding), Kat (Branding), David (Talent Showdown Producer), Dave and I went up to Regents Park to visit Musion.

Musion are the world leaders in 3D holographic projection systems and what we saw during their demonstration was fairly incredible, the basic idea is that an HD image is projected onto a transparent foil which makes it appear as if it were floating in mid air. The image can then be interacted with by a rehearsed presenter providing a very realistic holographic feel to the set-up.

The idea for Rave Live would be to to have this holographic set-up on the main stage and use it to present channel listings and student animations, along hosting the initial opening to the event. There was also another idea to provide some kind of live 'telepresence' (making a person appear as a hologram) for which we would need to provide the camera.

Dave and I went along to view this from a more technical perspective and as such we were looking at the real-time implications behind using Musion on the day, as such we came up with a list of pros and cons:

Pros:
  • Looks really good when it is shot and filmed well
  • They will provide the equipment to achieve this and also the man power to rig it up
  • They will provide some help to us when filming and producing the content for this
  • They can do it with a feed of HDSDI which we can achieve with a HDX900 from stores
  • If we can include this in one of the shows as an insert then it will look really professional and engage the audience really well
Cons:
  • It needs a lot of light for it to work and also it needs a light show to be effective
  • The equipment that they will bring is heavy which will put some restrictions on our shows rigs due to weight
  • It will take 6+ hours to rig which eats into a whole days rigging time, assuming that we cannot rig around them on the stage so this cuts the stages rig time by a day
  • The screen is expensive and can be broken, with students on and off stage all the time there would be a possibility that it could get broken
  • It works best with high contrast meaning there should be as little light off the stage as possible. With the venue being used as an exhibition as well there will be a lot of light spilling onto the stage
  • We're not sure how this will fit into the schedule, with the shows on stage and the time needed for the turn around will there be time to show anything on this?
  • We do not have the content yet, it seems a little bit too late to be making content now
Obviously a lot of these points require us liaising with representatives from Musion, especially the items concerning the actual rig. The idea is to start doing this as soon as management have decided how they wish to proceed and whether or not we will actually be using Musion.

Wednesday, 31 March 2010

Engineering - Talent Showdown

Last weekend we visited Coopers Technology College to give the producers of Talent Showdown a hand with the rig of their flyaway. Unfortunately we ran into a few technical hitches, notably due to a couple of unknown flaws in the rig of the sync. The initial system diagram (drawn by George Alton) can be seen below.

During the run up to the show there were minor flaws, mostly due to dodgy cable ends meaning that colour information kept being dropped in a couple of the camera outputs. Eventually we also realised that several of the cameras were losing their colour when they were run through the main programme bank of the vision mixer. After an hour or so of tweaking we couldn't find a solution and seeing as the preview outputs weren't losing their colour information we decided that it was something to do with the main programme bank. As a work around we then took the PVW output and ran this into a VDA and thus distributed it to the VTR's and the monitors.

Once the programme started we then ran into more problems, after the first five minutes a couple of the cameras kept dropping their sync during a cut from the vision mixer. This eventually got worse until they were not genlocking at all. The only feasible solution was to put tapes into all of the cameras and iso record them, all we had to do was sync up the timecode between the cameras to make it easier during the edit. We also recorded the camera that we were originally going to use as a back-up onto a VT Deck so that production would have plenty of options when it came to the final edit

After the shoot we realised that part of the reason that some of the cameras may have been losing their sync was because when shooting with composite video you have to be incredibly careful with timing, far more careful than we had been. Originally we ran the Black & Burst into a DA and distributed it across all of the equipment, what we apparently should have done is run a feed of BB into the vision mixer, then taking a separate assigned output of BB for each of the inputs and run these into the cameras, then taken the final BB o/p of the mixer into a DA and distributed that accordingly. We still need to verify that this is the case but at the moment that appears to be the thing that went wrong, however it doesn't explain why the timing was pretty much fine all morning!

At the end of the day we all managed to find a suitable work-around, it does mean that the post production team have a little more work to do and hopefully the footage doesn't turn out to be that bad.

Engineering - Cable Pulling

Here are a few photos of the cable looms that we pulled out of the Presentation and TX rack areas. After working out how we were going to organise them, they were then untangled from this mess and either coiled as single cables or made into new looms containing 8 cables each. This would hopefully allow the rig for Talent Showdown to go a lot quicker.





We also set up a small testing rig so consisting of an SPG, and a WFM both of which had long lengths of cable attached which could then be barrelled onto the end of the cable being tested. This served two purposes, firstly we could test the ends of the cables, ensuring that there was no signal dropout due to dodgy ends, secondly we could test that the overall length of the three cables did not affect the analogue test signal too much, this enabled us to have a test length which we could rig around.


Tuesday, 23 March 2010

Engineering - Cable Pulling

On Monday we began the new term by removing all of the cabling from the Presentation suite. As we had previously taken all of the equipment out and stacked it up in TV systems it seemed pointless to just leave the cabling underneath the bays, just waiting to be taken out after the move. Instead we saw an opportunity to re-use this cabling and in doing so, hopefully save ourselves some money.

The plan is to use a lot of the long coax in the Talent Showdown pre-record which is scheduled for this Sunday (28th) and basically make up the long cable runs from the cameras to the vision mixer by barreling lengths of coax together. Once this is over we can then begin cleaning up the cables and readying them for Matter, although we tried to keep the ends on many of the cables (again to decrease the amount material we'd have to buy in) we will inevitably have to re-end some of them and while this is being done we can ensure that we have batches of cables that are the right length for inter-equipment connection in our fly-away.

I'll post some pictures of the cabling up when we start inspecting it for Talent Showdown.